Prices Construction Materials Elevator Motor Korea Elevator

Prices Construction Materials Elevator Motor Korea Elevator

one. We are a professional construction elevator manufacturing facility in ZheJiang province
2. 10+ many years expertise
three. Skilled staff
four. Happy buyer comments
5. Zero incident substantial good quality items

Solution Description

rates design resources elevator motor korea elevator
Our development elevator (carry, hoist) is also referred to as out of doors development elevator, which is driven by pinions & racks products and with protected & comfortable cages. It can lift the two development supplies and travellers. It bases on its mast fixed in the floor and attached to the wall, which guarantee its safety 

Characteristic Design Rated Loading Lifting Speed Motor Energy
CZPT cages SC200/200 2×2000kg 33m/min 2×(3×11kw)
2×(3×8.5kw)
SC150/a hundred and fifty 2×1500kg 33m/min 2×(2×13kw)
SC100/a hundred 2×1000kg 33m/min 2×(2×11kw)
Solitary cage SC200 2000kg 33m/min 3×11kw
3×8.5kw
SC150 1500kg 33m/min 2×13kw
SC100 1000kg 33m/min 2×11kw

 

Characteristic Product Rated Loading Lifting Pace Motor Electrical power
CZPT cages Lower-velocity SC200/200D 2×2000kg -40m/min 2×(3×11kw)
2×(3×8.5kw)
SC100/100D 2×1000kg -40m/min 2×(2×13kw)
Mid-speed SC200/200Z 2×2000kg -60m/min 2×(2×23kw)
SC100/100Z 2×1000kg -60m/min 2×(2×15kw)
Single cage Low-pace SC200D 2000kg -40m/min 3×11kw
3×8.5kw
SC100D 1000kg -40m/min 2×13kw
Mid-pace SC200Z 2000kg -60m/min 2×23kw
SC100Z 1000kg -60m/min 2×15kw

Salient Features of charges design resources elevator motor korea elevator

one. Mast area welded by welding Robotic makes certain dependable quality and sophisticated visual appeal.

two. All the steel buildings are processed with blasting engineering to eliminate rust. The adhesion of surface portray is fantastic.

3. Suspension cage guarding board adopts figured aluminum plate and numerical manage punched aluminum plate. The suspension cage is light-weight and artistic in visual appeal. 

four. Transmission mechanism equipped by the specialist company has high effectiveness, lengthy provider existence and stability in functionality.

five. Comprehensive set of overload security devices, selection of limiters and mechanical chain devices ensure its dependability. Anti-falling protection device, which restricts the too much downward movement of the cage, protecting against and removing mishaps.

6. Frequency conversional development elevator is safe, steady and comfy. CZPTting electricity is smaller sized than functioning electrical power, vitality-saving and large successful.

 

Product detail

one. Production approach:  Strict material choice- blanking- inspection – welding- inspection- Blasting – inspection -Baking finished or galvanized- inspection – Finished Solution
2. The solution can be CZPT according to customers’requirements (drawing, technical specs and so on).

A.Cage Specifics

1.The cage is boarded up by all punched aluminum sheet ,Sidewall of Wire Mesh for cage is also CZPT. The measurement can be organized to your necessity.
( Optional Dimensions:3×1.5×2.1m, 3×1.3×2.1m, three.2×1.5×2.1m, three.2×1.3×2.1m, 3×1.5×2.4m, 3×1.3×2.4m, 3.2×1.5×2.4m, three.2×1.3×2.4m)
two. Principal construction of cage is made of large-high quality metal afterbending.(The bent steel is agency, good vertically, stability. Additionally it make certain steady of the whole framework.)

B. Requirements about mast area


The Mast section(shade is variable) is made of HF welding pipe and seamless pipe. (The high high quality seamlesssteel pipe is excellent vertically, anti-strain, anti-getting older, thickness and so on), it offer a well rail for cage climbs on.

 

650*650*1508mm is the most frequent dimensions suit for customers.

1. HF high quality tube&pipe Q345B good vertical.
two. Metal plate Q235B with higher good quality from Baosteel Group, metal plates are bent of U shape to stren-gthen the mast segment
3. Mast segment with galvanized coat or heat spray coat can be decided on

4. Metal spherical bar Q235B with higher good quality and bolster the mast section
 Other design of mast area can select:
450*450*1508mm, 650*900*1508mm,800*800*1508mm
Materials about Rack gear
1.Model: forty*60*1508mm, or 40*sixty*1483mm or OEM in accordance to drawing or sample
two.Components: CL60 special rail steel,60# large high quality carbon metal(widespread use)or other variety C55,C50,C45 according to your requirement.

C.Accomplished protection steps of creating raise platform

1. Equiping with Anti-slipping govenor 
2. CZPTal an Mechanical interlock: CZPT safety switches, Slack rope swap
3. Security hook
four. Higher and base restrict swithes, trap door restrict swap
five. Overload protector
6. Bottom Buffer
seven. Degree Contacting program and car leveling gadget to be pick.

 

D. Diverse driven program

Higher effective&strength preserving designs: 

1. 2000kg load for every cage can select motor: 3×8.5kw, 2x11kw, 2x13kw with energy saving figures. 3x11kw with frequent character. (With gearbox much more than 90% vitality utilization price) lower velocity type
two. 1000kg load for every cage can decide on motor: 2×8.5kw, 2x11kw with gearbox more than ninety% strength usage price.) minimal velocity variety
three. 1500kg load per cage can select motor: 2x13kw, 2x15kw with gearbox or worm reducers. Low velocity sort
four. 2000kg load with mid-speed: 3x15kw,2x23kw and 2x26kw with higher productive gearbox.
Notice: (SEW,CZPT OR KOREA Model MOTOR COULD BE Decide on)
Solution advantages
A. High-quality configuration

 

There is PLC technique in the development hoist CZPT inverter. It keeps the hoist operating smoothly when commencing and breaking.
The mast section is welded by robotic, and there is not often deformation of the mast section method
 

B. Higher steadiness
The rack’s raw material adopts sixty# metal, and the common error inside of .3-.4mm is much more correct than standard error

The mast section stulls are adjust to U-shape composition refers to the Alimak Hek technology, and they can be a lot more sound than domestic standard kinds

 

C. Substantial stability
When the hoist moves also quickly, or overruns the restrict velocity that we set, the safety gadget will start off to function and quit the hoist.
The limit change will make the hoist stop when it moves to the top and base of the mast sections.
The overland alarm equipment.
The hoist even now supports lights when it stops working with the doorway open.

 

Packing & Delivery

packing container

Shipping

Typically ship by MAERSK/MSC/CMA/APL depending on client prerequisite
For common items,cargo will be arranged inside 7-10 times soon after creation
B/L amount will be presented about 5 days right after shipment.

 

FAQ
We are professional construction hoist company.We shell out our all consideration to the scorching offer bridge elevator for lifting folks and content for development design and style manufacture,servicing and soon after-revenue service.

You can get high top quality items and professional provider from us.
 

Any query from you is welcome and will get reply in 24 hours.
 

 

 

 

 

 

 

 

Prices Construction Materials Elevator Motor Korea Elevator

Tags: